$0.00
The Amrocor MPP-1204J-44 industrial generator set is a high-performance power solution built for standby, prime, and continuous power applications. Designed for demanding environments, it ensures unmatched reliability and efficiency through the integration of a Perkins Engine, Stamford Alternator, and Deepsea Control Panel.
Specification | Details |
---|---|
Manufacturer | Perkins |
Cylinders | 4, Vertical Inline |
Cycle | 4-Stroke |
Aspiration | Turbocharged, Air-to-Air Charge Cooled |
Bore x Stroke (mm) | 105 x 127 |
Displacement | 4.4L |
Compression Ratio | 16.5:1 |
Prime Power | 117 kW @ 1800 rpm |
Standby Power | 129 kW @ 1800 rpm |
Speed Governor | ECM |
Cooling System | Forced Liquid Cooling Cycle |
Lubrication Capacity | 8.4L |
Fuel Consumption | 203 g/kWh (at 100% load) |
Specification | Details |
---|---|
Model | UCI274C CSA Approved |
Power Output | 100 kW |
Frequency/Speed | 60Hz / 1800 rpm |
Exciter Type | Brushless, Self-excited |
Power Factor | 0.8 |
Voltage Adjustment Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Features | Details |
---|---|
Model | DSE6020 |
Digital Readouts | Voltage, frequency, engine speed, battery voltage, hours run |
Failure Indicators | Overspeed/underspeed, low oil pressure, high water temperature, failure to start |
Automatic Shutdown | Low oil pressure, high water temperature, overspeed, failure to start |
The Amrocor MPP-1204J-44 offers a reliable, efficient, and durable power solution designed to meet ISO8528, NEC, and CEC standards. Ideal for diverse applications, it ensures consistent performance even in the most challenging environments.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.