The Amrocor MG20RSE-EB Generator Set with ATS offers superior performance, efficiency, and reliability for both standby and prime power needs. With advanced features like dual-fuel capabilities, a liquid-cooled engine, and a comprehensive remote Wi-Fi controller, this generator is ideal for a variety of applications.
Attribute | Details |
---|---|
Engine Model | MG20RSE-EB with ATS |
Fuel Type | Natural Gas (NG), Propane (LPG) |
Engine Manufacturer | Suzuki |
Engine Volume (cc) | 1216 |
Compression Ratio | 9.5:1 |
Ignition System | ECM Ignition |
Starting Motor | QDY 112, 12V, 0.8kW |
Bore x Stroke (mm) | L4 – 70 x 79 |
Cooling System | Liquid Cooled |
Oil Capacity (L) | 3.5 |
Charging Method | 14V 70A Charging Motor |
Recommended Battery Start Current (CCA) | 550A |
Attribute | Details |
---|---|
Type | Synchronous generator with rotating magnetic field |
Voltage Regulation System | AVR |
Pole | 2 |
THD at Full Load | ≤ 5% |
Stator & Rotator Material | Copper |
Governor Type | Electronic |
Frequency Regulation | ± 0.5% synchronism |
Controller Location: Mounted beside the alternator
Fuel Type | Consumption at 100% Load |
---|---|
NG Consumption (m³/hr) | 7.26 |
LPG Consumption (kg/hr) | 3.80 |
NG Pressure Range (kPa) | 1.3 – 3.5 |
LPG Pressure Range (kPa) | 1.7 – 3.5 |
Noise at 23 ft (7 m): 75 dB(A)
Parameter | Details (mm) |
---|---|
Unit Dimensions (L x W x H) | 1200 x 740 x 826 |
Package Dimensions (L x W x H) | 1290 x 800 x 900 |
Net Weight (kg) | 345 |
Gross Weight (kg) | 370 |
The Amrocor MG20RSE-EB Generator Set offers seamless power delivery, advanced features, and reliability to support critical operations efficiently under varying conditions.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.