$0.00
The Amrocor AGS-1106D-E70TAG3 is a high-performance, integrated power generation solution designed for versatile use in standby, prime, and continuous power applications. Featuring top-tier components, including a Perkins Engine, Stamford Alternator, and Deepsea Control Panel, it offers reliability and durability for various industrial and commercial applications.
Attribute | Details |
---|---|
Manufacturer | Perkins |
Cylinders | 6 Cylinders, Vertical Inline |
Cycle | 4-Stroke |
Aspiration | Turbocharged Aftercooled |
Bore x Stroke (mm) | 105 x 135 |
Displacement | 7 L |
Compression Ratio | 16.8:1 |
Prime Power/Speed | 170 kW/1800 RPM |
Standby Power/Speed | 191 kW/1800 RPM |
Cooling System | Forced Liquid Cooling Cycle |
Fuel Consumption | 212 g/kWh (100% Prime Power Load) |
Lubrication System Capacity | 8.4 L |
Starter Motor | DC24V |
Attribute | Details |
---|---|
Output Power | 150 kW |
Frequency/Speed | 60Hz / 1800 RPM |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Features | Details |
---|---|
Digital Readouts | Voltage, Frequency, Speed, Battery Voltage, Engine Hours |
Failure Indicators | Overspeed/Underspeed, Low Oil Pressure, High Water Temperature, Battery Charger Failure |
Automatic Shutdowns | Low Oil Pressure, High Water Temperature, Overspeed/Underspeed, Failure to Start |
The Amrocor AGS-1106D-E70TAG3 provides a dependable power solution for various sectors, offering robust performance, efficiency, and minimal downtime.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.