$54,500.00 Original price was: $54,500.00.$51,775.00Current price is: $51,775.00.
The Amrocor MNG175REG is a 175 kW dual-fuel generator designed for reliable performance, featuring both Natural Gas (NG) and Propane (LPG) fuel options. With its robust K6LTAA8.9 engine, this generator is ideal for industrial and commercial applications where reliable power is essential.
Parameter | Details |
---|---|
Rated Power (LPG/NG) | 175 kW |
Frequency | 60 Hz |
Engine/Alternator RPM | 1800 RPM |
Power Factor | 0.8 |
Parameter | Details |
---|---|
Engine Model | K6LTAA8.9 |
Engine Power | 200 kW |
Displacement | 8.9 L |
Speed | 1800 RPM |
Compression Ratio | 10:1 |
Bore x Stroke (mm) | 114 x 135 |
Cooling Method | Liquid Cooled |
Oil Capacity | 27.6 L |
Mixer | IMPCO USA |
Ignition System | Made in Canada |
Speed Governor | WOODWARD |
Parameter | Details |
---|---|
Type | Brushless, Self-excited |
Power | 175 kW |
Connection Method | SAE Standard |
Insulation Grade | H |
Fuel Type | Consumption (100% Load) | Pressure Range (kPa) |
---|---|---|
Natural Gas | 0.3 m³/kW·hr | 1.5 – 5 |
Propane | 9.3 kg/hr | 1.7 – 5 |
Feature | Details |
---|---|
Canopy | Powder-coated, sound-insulated, weatherproof, soundproof |
Emergency Stop Switch | Included |
Protection Level | IP 23 |
Parameter | Details |
---|---|
Dimensions (L x W x H) | 3600 x 1300 x 1900 mm |
Net Weight | 2560 kg |
The Amrocor MNG175REG is suitable for a variety of applications, including:
With its 175 kW power output and dual-fuel versatility, the Amrocor MNG175REG generator is an excellent solution for industries and commercial enterprises that demand reliability, efficiency, and adaptability.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.