$0.00
The Amrocor AGS-1106D-E70TAG4 is a powerful and reliable generator set, designed to meet the diverse power needs of industrial, commercial, and emergency applications. Featuring a Perkins engine, Stamford alternator, and Deepsea control panel, this integrated system offers exceptional performance, durability, and efficiency.
Attribute | Details |
---|---|
Manufacturer | Perkins |
Number of Cylinders | 6 Cylinders, Vertical Inline |
Cycle | 4-Stroke |
Aspiration | Turbocharged Aftercooled |
Bore x Stroke (mm) | 105 x 135 |
Displacement | 7 L |
Compression Ratio | 16.8:1 |
Prime Power/Speed | 190 kW / 1800 RPM |
Standby Power/Speed | 209 kW / 1800 RPM |
Cooling System | Forced Liquid Cooling Cycle |
Fuel Consumption at 100% Prime Power | 212 g/kWh |
Total Coolant Capacity | 20.5 L |
Starter Motor | DC24V |
Attribute | Details |
---|---|
Output Power | 175 kW |
Frequency/Speed | 60Hz / 1800 RPM |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Features | Details |
---|---|
Digital Readouts | Generator voltage, Frequency, Engine speed, Battery voltage, Engine hours |
Failure Indicators | Overspeed/Underspeed, Low Oil Pressure, High Water Temperature, Battery Charger Failure |
Automatic Shutdowns | Low Oil Pressure, High Water Temperature, Overspeed/Underspeed, Failure to Start |
The Amrocor AGS-1106D-E70TAG4 generator set delivers unparalleled reliability and performance, ensuring your operations continue smoothly with minimal downtime.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.