The Amrocor AGS-1106D-E70TAG4 generator set offers unmatched power generation solutions, tailored for prime, standby, and continuous power applications. Powered by high-quality components, including Perkins Engine, Stamford Alternator, and Deepsea Control Panel, this system guarantees reliability, efficiency, and user-friendly operation.
Mode | Output Power | Speed | Overload Capability |
---|---|---|---|
Prime Power | 190 kW | 1800 RPM | 10% overload for 1 hour in 12 |
Standby Power | 209 kW | 1800 RPM | No overload permitted |
Specification | Detail |
---|---|
Model | 1106D-E70TAG4 |
Configuration | 6-cylinder, vertical inline |
Cycle | 4-Stroke |
Aspiration | Turbocharged Aftercooled |
Displacement | 7 L |
Compression Ratio | 16.8:1 |
Cooling System | Forced liquid cooling cycle |
Coolant Capacity | 20.5 L |
Fuel Consumption | 212 g/kW h at 100% prime power |
Starter Motor | DC24V |
Specification | Detail |
---|---|
Model | UCI274 CSA Approved |
Output Power | 185 kW |
Frequency | 60 Hz |
Exciter Type | Single Bearing, Brushless, Self-excited |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Specification | Features |
---|---|
Model | DSE |
Monitoring Parameters | Voltage, frequency, engine speed, battery voltage, engine runtime |
Failure Indicators | Overspeed, emergency stop, low oil pressure, high water temperature |
Automatic Shutdown Triggers | Low oil pressure, high water temperature, overspeed, repeated start failures |
The Amrocor AGS-1106D-E70TAG4 is engineered for performance and dependability, meeting the highest standards of efficiency and durability for all your power generation needs.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.