$52,000.00 Original price was: $52,000.00.$49,400.00Current price is: $49,400.00.
Amrocor industrial generator sets are fully integrated power generation systems, offering exceptional performance, reliability, and versatility for a wide range of applications, including standby, prime, and continuous power solutions. These generators are powered by Volvo engines, Stamford alternators, and Deepsea control panels, ensuring optimal operation in both commercial and industrial environments.
Power Type | Output Power (kW) | Frequency | Phase |
---|---|---|---|
Prime Power | 219 | 60Hz | 3 |
Standby Power | 246 | 60Hz | 3 |
Attribute | Details |
---|---|
Manufacturer | Volvo Penta |
Cylinders | 6, Inline |
Cycle | 4-Stroke |
Aspiration | Wastegate Turbocharger |
Bore x Stroke (mm) | 108 x 130 |
Displacement | 7.15 L |
Compression Ratio | 17:1 |
Prime Power | 219 kW @ 1800 rpm |
Standby Power | 246 kW @ 1800 rpm |
Fuel Consumption (100%) | 205 g/kW·h |
Cooling System | Forced Liquid Cooling |
Lubrication Capacity | 29 L |
Emissions | US EPA Tier 3 |
Attribute | Details |
---|---|
Power | 200 kW |
Frequency/Speed | 60 Hz / 1800 rpm |
Exciter Type | Single Bearing, Brushless |
Power Factor | 0.8 |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Voltage Adjustment Range | ≥5% |
Amrocor Industrial Generator Sets offer a robust, high-performance power solution, designed to deliver reliable and efficient power when it is needed most. With advanced features, thorough testing, and compliance with global standards, these generators ensure long-lasting and trouble-free service in diverse applications.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.