Amrocor Industrial Generator Sets are engineered to deliver optimum performance, reliability, and flexibility for a wide range of power applications, including standby, prime, and continuous power needs. These fully integrated systems are powered by the advanced Volvo Engine, Stamford Alternator, and Deepsea Control Panel, ensuring exceptional durability and efficiency.
Power Type | Output Power | Frequency | Phase |
---|---|---|---|
Prime Power | 219 kW | 60 Hz | 3 |
Standby Power | 246 kW | 60 Hz | 3 |
Attribute | Details |
---|---|
Manufacturer | Volvo Penta |
Cylinders | 6 Cylinders Inline |
Cycle | 4 Stroke |
Aspiration | Wastegate Turbocharger |
Bore x Stroke (mm) | 108 x 130 |
Displacement | 7.15 L |
Compression Ratio | 17:1 |
Prime Power | 219 kW @ 1800 rpm |
Standby Power | 246 kW @ 1800 rpm |
Cooling System | Forced Liquid Cooling Cycle |
Lubrication Capacity | 29 L |
Fuel Consumption | 205 g/kWh |
Emissions | US EPA Tier 3 |
Attribute | Details |
---|---|
Power Output | 220 kW |
Frequency | 60 Hz |
Exciter Type | Brushless, Single Bearing |
Power Factor | 0.8 |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
The Deepsea Control Panel provides advanced digital monitoring of key generator functions:
Amrocor Industrial Generator Sets combine cutting-edge engine and electrical technology with exceptional design to provide the highest level of performance and dependability for a wide range of power applications. Whether you need a reliable power backup or a prime power solution, these generator sets are built to meet the most demanding operational environments.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.