$19,000.00 Original price was: $19,000.00.$18,050.00Current price is: $18,050.00.
Amrocor Industrial Generator Sets
Amrocor’s industrial generator sets are comprehensive power generation solutions designed to deliver exceptional performance, reliability, and adaptability for both standby and prime power needs.
Powered by:
Key Features:
Power Ratings:
Performance Testing:
Each generator undergoes rigorous testing, including operation at 50%, 75%, 100%, and 110% loads, and a thorough check of all safety and control features.
Additional Equipment:
Attribute | Value |
---|---|
Model Number | MPI-25-1240-60 |
Power Output | 25 kW / 31.25 kVA |
Voltage | 120/240V |
Phase | Single Phase |
Power Factor | 0.8 |
Attribute | Value |
---|---|
Model | 4LE2T |
Type | 4-cylinder inline, 4-stroke, turbocharged engine |
Displacement | 2.179L |
Prime Power/Speed | 30kW at 1800 rpm |
Standby Power/Speed | 28kW at 1800 rpm |
Cooling | Forced liquid cooling cycle |
Lubrication System Capacity | 8.4L |
Coolant Capacity | 4.1L |
Fuel Consumption (75% Load) | 230g/kW h |
Attribute | Value |
---|---|
Model | PI144F (CSA Approved) |
Power Output | 25 kW |
Frequency/Speed | 60Hz/1800 rpm |
Type | Brushless exciter |
Voltage Regulation | ≤+0.5% NL-FL |
Insulation | Grade H |
Protection | IP23 |
Attribute | Value |
---|---|
Model | DSE |
Digital Displays | Generator voltage, Output frequency, Engine speed, Battery voltage, Engine runtime |
Indicators for Failures | Overspeed/underspeed, Emergency stop, Low oil pressure, High water temperature, Battery charger issues |
Automatic Shutdown Triggers | Low oil pressure, High water temperature, Overspeed/underspeed, Failure to start after three attempts |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.