The Amrocor MNG40REG Generator is a robust power solution designed for industrial and commercial use. It operates on both Natural Gas (NG) and Propane (LPG), offering flexibility, efficiency, and reliable performance under demanding conditions. With advanced safety features, durable construction, and optimized fuel consumption, this generator meets diverse power requirements.
Specification | Details |
---|---|
Model | MNG40REG |
Fuel Type | Natural Gas (NG), Propane (LPG) |
Rated Power (LPG/NG) | 40 kW |
Frequency | 60 Hz |
Engine Model | K4BTA3.9 |
Engine Power | 50 kW |
Displacement | 3.9 L |
Speed | 1800 RPM |
Compression Ratio | 10:1 |
Bore x Stroke (mm) | 102 x 120 |
Oil Capacity (L) | 9.5 |
Mixer | IMPCO USA |
Ignition System | Made in Canada |
Speed Governor | WOODWARD |
Specification | Details |
---|---|
Type | Brushless, Self-excited |
Power | 40 kW |
Connection Method | SAE Standard |
Insulation Grade | H |
Fuel Type | Consumption at 100% Load |
---|---|
NG Consumption (m³/kW·hr) | 0.3 |
LPG Consumption (kg/hr) | 9.3 |
NG Pressure Range (kPa) | 1.5 – 5 |
LPG Pressure Range (kPa) | 1.7 – 5 |
Feature | Details |
---|---|
Enclosure Type | Weatherproof & Soundproof |
Canopy | Powder-coated, sound-insulated |
Emergency Stop | Integrated emergency stop switch |
Protection Level | IP 23 |
Parameter | Details (mm) |
---|---|
Dimensions (L x W x H) | 2250 x 950 x 1350 |
Net Weight (kg) | 1290 |
The Amrocor MNG40REG Generator is ideal for:
Engineered for reliability, safety, and efficiency, the MNG40REG delivers exceptional performance in a wide range of applications.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.