$0.00
Amrocor Industrial Generator Sets are engineered for superior performance, offering reliability and versatility in standby, prime, and continuous power applications. With advanced technology and robust components, these generator sets are ideal for meeting various power generation needs in industrial environments.
Specification | Details |
---|---|
Model | 2806F-E18TAG1 |
Manufacturer | Perkins |
Cylinders | 6 |
Cycle | 4 Stroke |
Aspiration | Turbocharged and Air-to-Air Chargecooled |
Bore x Stroke | 145 x 183 mm |
Displacement | 18.1 L |
Compression Ratio | 16:1 |
Prime Power/Speed | 501 kW / 1800 rpm |
Standby Power/Speed | 555 kW / 1800 rpm |
Speed Governor | ECM |
Cooling System | Forced Liquid Cooling |
Lubrication Capacity | 74 L |
Fuel Consumption (75% Load) | 126.7 L/h |
Starter Motor | DC 24V |
Specification | Details |
---|---|
Model | HCI544 |
CSA Approved | Yes |
Power Output | 450 kW |
Frequency/Speed | 60 Hz / 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjustment | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Feature | Details |
---|---|
Model | DSE |
Digital Readouts | Generator Voltage, Frequency, Engine Speed, Battery Voltage, Engine Hours Run |
Failure Indicators | Overspeed, Low Oil Pressure, High Water Temperature, Emergency Stop |
Automatic Shutdowns | Low Oil Pressure, High Water Temperature, Overspeed, Failure to Start after Three Attempts |
Amrocor Industrial Generator Sets combine high performance, reliability, and efficiency, offering dependable power solutions for various industrial applications.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.