$0.00
Amrocor’s MPP-550-3600-60 Industrial Generator Set provides an optimal, reliable, and versatile solution for standby, prime, and continuous power applications. Designed for demanding environments, it ensures high performance and durability in critical power supply situations.
Specification | Details |
---|---|
Model | 2806C-E18TAG3 |
Manufacturer | Perkins |
Number of Cylinders | 6 Cylinders in line |
Cycle | 4 Stroke |
Aspiration | Turbocharged & Air-to-Air Chargecooled |
Bore x Stroke | 145 x 183 mm |
Displacement | 18.1 L |
Compression Ratio | 14.5:1 |
Prime Power/Speed | 618 kW / 1800 rpm |
Standby Power/Speed | 678 kW / 1800 rpm |
Speed Governor | ECM |
Cooling System | Forced Liquid Cooling Cycle |
Coolant Capacity | 61 L |
Fuel Consumption at 100% Load | 209 g/kWh |
Starter Motor | DC24V |
Alternator | DC24V |
Specification | Details |
---|---|
Model | HCI634 CSA Approved |
Power Output | 550 kW |
Frequency/Speed | 60 Hz / 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 (Three Phase) |
Feature | Details |
---|---|
Model | DSE |
Digital Readouts | Generator Voltage, Output Frequency, Engine Speed, Battery Voltage, Engine Hours Run |
Failure Indicators | Overspeed, Low Oil Pressure, High Water Temperature, Emergency Stop |
Automatic Shutdowns | Low Oil Pressure, High Water Temperature, Overspeed, Failure to Start After Three Attempts |
Amrocor’s MPP-550-3600-60 Industrial Generator Set provides unmatched power reliability, ensuring that critical systems and operations remain uninterrupted under any conditions.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.