$0.00
The Amrocor Industrial Generator Set is a cutting-edge solution for standby, prime, and continuous power applications. Designed for maximum performance, reliability, and versatility, it is ideal for a wide range of industrial and commercial uses.
Attribute | Details |
---|---|
Model | 2806C-E18TTAG7 |
Manufacturer | Perkins |
Number of Cylinders | 6 Cylinders in Line |
Cycle | 4 Stroke |
Aspiration | Parallel Turbocharged & Air-to-Air Chargecooled |
Bore x Stroke (mm) | 145 x 183 |
Displacement | 18.1 L |
Compression Ratio | 14:1 |
Prime Power | 747 kW @ 1800 rpm |
Standby Power | 821 kW @ 1800 rpm |
Speed Governor | ECM |
Cooling System | Forced Liquid Cooling Cycle |
Steady Speed Drop | ≤1% |
Total Coolant Capacity | 210 L |
Fuel Consumption | 212 g/kWh (at 100% Load) |
Attribute | Details |
---|---|
Model | HCI634 CSA Approved |
Power Output | 680 kW |
Frequency/Speed | 60 Hz / 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Attribute | Details |
---|---|
Model | DSE |
Readouts | Generator voltage, output frequency, engine speed, battery voltage, engine hours run |
Failure Indicators | Overspeed/underspeed, low oil pressure, high water temperature, battery charger failure |
Automatic Shutdowns | Low oil pressure, high water temperature, overspeed, failure to start after three attempts |
The Amrocor 2806C-E18TTAG7 Generator Set is a comprehensive power solution, combining innovative technology, robust engineering, and superior performance to meet the most demanding energy needs.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.