The Amrocor Industrial Generator Set is a premium, integrated power solution designed for standby, prime, and continuous power applications. This advanced system ensures optimal performance, reliability, and adaptability for diverse power requirements in industrial and commercial settings.
Specification | Details |
---|---|
Model | 2806C-E18TTAG7 |
Manufacturer | Perkins |
Cylinders | 6 Cylinders in line |
Cycle | 4-Stroke |
Aspiration | Parallel Turbocharged, Air-to-Air Chargecooled |
Bore x Stroke (mm) | 145 x 183 |
Displacement | 18.1 L |
Compression Ratio | 14:1 |
Prime Power/Speed | 747 kW @ 1800 rpm |
Standby Power/Speed | 821 kW @ 1800 rpm |
Cooling System | Forced Liquid Cooling Cycle |
Total Coolant Capacity | 210 L |
Fuel Consumption | 212 g/kWh @ 100% Load |
Starter Motor | DC24V |
Alternator | DC24V |
Specification | Details |
---|---|
Model | HCI634 CSA Approved |
Power Output | 680 kW |
Frequency/Speed | 60 Hz @ 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Attribute | Details |
---|---|
Model | DSE |
Displays | Generator voltage, frequency, engine speed, battery voltage, runtime |
Indicators | Overspeed/underspeed, low oil pressure, high water temperature, failure to start, battery charger failure |
Automatic Shutdowns | Low oil pressure, high water temperature, overspeed/underspeed, failure to start |
The Amrocor 2806C-E18TTAG7 Industrial Generator Set ensures seamless, efficient, and reliable power for any critical application, supported by cutting-edge technology and superior build quality.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.