The Amrocor Industrial Generator Set is a fully integrated, high-performance power generation system designed for standby, prime, and continuous power applications. Engineered for reliability and efficiency, it is ideal for demanding industrial and commercial environments.
Parameter | Details |
---|---|
Model | 2806C-E18TTAG6 |
Manufacturer | Perkins |
Cylinders | 6 Cylinders in line |
Cycle | 4-Stroke |
Aspiration | Parallel Turbocharged, Air-to-Air Chargecooled |
Bore x Stroke (mm) | 145 x 183 |
Displacement | 18.1 L |
Compression Ratio | 14:1 |
Prime Power/Speed | 716 kW @ 1800 rpm |
Standby Power/Speed | 785 kW @ 1800 rpm |
Cooling System | Forced Liquid Cooling Cycle |
Coolant Capacity | 110 L |
Fuel Consumption | 212 g/kWh at 100% load |
Starter Motor | DC24V |
Parameter | Details |
---|---|
Model | HCI634 CSA Approved |
Power Output | 700 kW |
Frequency/Speed | 60 Hz @ 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 1 |
Features | Details |
---|---|
Model | DSE |
Readouts | Generator voltage, output frequency, engine speed, battery voltage, runtime |
Failure Indicators | Overspeed/underspeed, low oil pressure, high water temperature, failure to start, battery charger failure |
Automatic Shutdown | Low oil pressure, high water temperature, overspeed/underspeed, failure to start after three attempts |
The Amrocor 2806C-E18TTAG6 Generator Set offers robust performance with versatile features, making it the ideal choice for industries requiring uninterrupted, reliable power solutions.
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.