Amrocor’s industrial generator sets are advanced power generation systems engineered to deliver exceptional performance, reliability, and versatility for continuous, prime, and standby power applications.
Each generator undergoes a stringent testing regimen, including performance evaluation at 50%, 75%, 100%, and 110% loads. All safety and control shutdown features are meticulously verified.
Attribute | Value |
---|---|
Model | TWD1744GE |
Manufacturer | Volvo |
Number of Cylinders | 6 Cylinders Inline |
Cycle | 4-Stroke |
Aspiration | Wastegate Turbocharged |
Bore x Stroke (mm x mm) | 149 x 165 |
Displacement | 17.26 L |
Compression Ratio | 16.5:1 |
Prime Power / Speed | 682 kW / 1800 rpm |
Standby Power / Speed | 750 kW / 1800 rpm |
Speed Governor | ECM |
Cooling System | Forced Liquid Cooling Cycle |
Steady Speed Drop | ≤1% |
Total Lubrication System Capacity | 58 L |
Fuel Consumption at 75% Load | 197 g/kW h |
Starter Motor | DC24V |
Alternator | DC24V |
Attribute | Value |
---|---|
Model | HCI544 (UL/CSA Approved) |
Power Output | 700 kW |
Frequency/Speed | 60Hz / 1800 rpm |
Exciter Type | Single Bearing, Brushless, Self-Excited |
Power Factor | 0.8 |
Voltage Adjust Range | ≥5% |
Voltage Regulation NL-FL | ≤+1% |
Insulation Grade | H |
Protection Grade | IP23 |
Phase | 3 |
Attribute | Value |
---|---|
Model | DSE (UL/CSA Approved) |
Digital Displays | Generator voltage, Output frequency, Engine speed, Battery voltage, Engine runtime |
Failure Indicators | Overspeed/underspeed, Emergency stop, Low oil pressure, High water temperature, Battery charger failure |
Automatic Shutdown Conditions | Low oil pressure, High engine water temperature, Overspeed/underspeed, Failure to start after three attempts |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.