7029D Synthetic Polyurea Grease – 35B Pail

$2,995.00

Description

Sinopec 7029D Grease Great Wall Synthetic Oil For Centralized Lubrication Systems is refined based on organic gelling agent thickened synthetic oil, with the addition of multiple additives for oxidation-resistant and anti-corrosion, etc.

Advantages

  • Excellent oxidation stability performance, preventing the lubricating grease from deteriorating under high temperature circumstances
  • Excellent low-temperature performance can guarantee the normal operation of the bearing under low temperature circumstances
  • Excellent low-temperature performance, ensuring normal starting and lubrication of the bearing under low temperature environment
  • Good anti-sprinkling performance applies to lubrication of bearing of damp environment
  • Good pumping performance, applicable for the centralized lubrication system
  • Good lubricity can protect the bearing from wearing
  • Excellent comprehensive performance, ensuring a relatively long service life for the bearing

Typical Properties

 Items 7029D lubricating grease
0 1 1.5
Working penetration, 0.1mm 362 326 298
Drop point, C 269 275 271
Corrosion (45 steel sheet, 100 C, 3hrs) Qualified Qualified Qualified
Evaporation loss (150 C, 1hr), % (m/m) 1.26 1.31 1.60
Similar viscosity (-30 C, 10s-1), Pa-s 387 703 790

Dimensions

Length 13 in. (Diameter)
Width 13 in. (Diameter)
Height 15 in.
Weight 40 lb.
Volume 17 kg.
Pack 40 lb Pail
Opening 12 in.

 

Full Pallet Shipping Dimensions 45″ x 45″ x 48″
Full Pallet Quantity (36) 40 lb Pails
Full Pallet Shipping Weight 1495 lbs.

Delivery Notice

We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.

As a general guideline, estimated production times are as follows:

Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks

While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.

By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.

Request Quote