Amrocor HP-R Blue EP-2 High Temp Grease is an extreme pressure, heavy-duty wheel bearing and chassis grease, formulated with a lithium complex soap thickener and high quality mineral base oil. It contains rust and oxidation inhibitors, EP and antiwear additives to ensure excellent performance and long life, even in severe service conditions such as high temperatures, shock loading and where water contamination is possible.
Appearance: “Normal” Grease
Consistency: Peanut Butter
Pack Size: 400LB Drum?(180KG?Volume),?Grade:?NLGI 2
Amrocor ?Blue EP-2 High Temp Grease is suitable for use in:
Features and Benefits
Amrocor HP-R Blue EP-2 High Temp Grease Specifications
NLGI?grade | 2-3 |
Appearance, visual | Smooth,?blue, buttery |
Thickener type | Lithium complex |
Base fluid type | Mineral |
Cone penetration, ASTM D 217
W?60, mm?1 W?100,000, mm?1 |
253 16 |
Dropping point, ?C, ASTM D 566 | ?296 |
Oil separation, 24 h @ 100?C, %, FTMS 791C-321.3 | 0.3 |
Four ball EP, PB, N, ASTM D 2596 | 0.50 |
Corrosion prevention, 48 h @ 52?C, rating, ASTM D 1743 | pass |
Copper corrosion, T2 copper strip, 24 h @ 100?C, rating, ASTM D 4048 | pass |
Timken OK load, N, ASTM D 2509 | 178 |
Water washout, 1 h @ 79?C, %, ASTM D 1264 | 1 |
Oxidation stability, 100 h @ 99?C & 758 kPa, pressure drop, kPa, ASTM D 942 | 21 |
Car wheel bearing test (accelerated) 20 h @ 160?C, leakage, g, ASTM D 4290 | ?1.3
|
Additional shipping fees will apply to residential, limited access,?deliveries outside?the regular delivery network?or?locations requiring?a lift gate to complete delivery.
Length | 23 in. (Diameter) |
Width | 23 in. (Diameter) |
Height | 35 in. |
Weight | 445?lb. |
Volume | 180 kg. |
Pack | 400 lb Drum |
Opening – Large | 2 in. NPT |
Opening – Small | ? in. NPT |
Full Pallet Shipping Dimensions | 46″ x 46″ x 40″ |
Full Pallet Quantity | (4) 400 lb Drums |
Full Pallet Shipping Weight | 1835?lbs. |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.