China Vertical Milling Machine CTZX32 220V Conventional Drilling and Milling PLC & Bearing Core Components Competitive Price

$6,300.00

In Stock

Description

The drilling and milling machine is engineered for high-accuracy performance, ensuring precise results for teaching demonstrations and various industrial applications. Its 3-axis functionality allows users to perform both drilling and milling operations, offering flexibility and versatility for diverse tasks.

Designed with long-lasting core components, including bearings, motors, pumps, gears, PLC, pressure vessels, engines, and gearboxes, the machine is backed by a 1.5-year warranty, providing users with peace of mind and protection from potential failures.

The machine is supported by comprehensive after-sales service, including online assistance to ensure minimal downtime and increased productivity. Additionally, it features an energy-efficient 0.75 kW spindle motor and a spindle speed range of 95 to 1420 r.p.m, making it an economical choice for users in machinery repair shops and machine shops.

 

Key Attributes

Attribute Details
Type Horizontal Drilling & Milling Machine
Table Travel (X) 410 mm
Table Travel (Y) 205 mm
Table Travel (Z) 310 mm
Machining Capacity Light Duty
Spindle Taper MT3
Range of Spindle Speed (r.p.m) 95 – 1420 r.p.m
Voltage 220V
Weight (kg) 205
Warranty 1.5 years
Max. Table Load (kg) 200
Place of Origin Anhui, China
Brand Name Amrocor
Model Number CTZX32
Dimensions (LWH) 10008001200 mm
Key Selling Points High Accuracy
Machinery Test Report Provided
Video Outgoing-Inspection Provided

Delivery Notice

We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.

As a general guideline, estimated production times are as follows:

Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks

While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.

By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.

Request Quote