$3,780.00
The CT125 offers high-accuracy machining, making it ideal for industries like manufacturing, garment shops, and hotels. As a 3-in-1 lathe, drill, and mill combo, it provides versatile functionality for various workshop tasks.
With a low power consumption of 180W, the CT125 is energy-efficient, reducing electricity costs and environmental impact. It features a compact design at 520x300x410mm and weighs just 22kg, making it easy to install and maintain in different settings, including home use and retail.
Backed by a 1.5-year warranty on core components and online support, the CT125 ensures reliability and peace of mind for users.
Attribute | Value |
---|---|
Max. Length of Workpiece (mm) | 125 |
Machining Capacity | Light Duty |
Attribute | Value |
---|---|
Range of Spindle Speed (r.p.m) | 560 – 2500 r.p.m |
Type | Combo Lathe |
Spindle Motor Power (kW) | 0.18 |
Voltage | 110V / 220V |
Weight (kg) | 22 KG |
Warranty | 1.5 Years |
Place of Origin | Anhui, China |
Brand Name | Amrocor |
Model Number | CT125 |
Dimension (LWH) | 520300410mm |
Key Selling Points | High-Accuracy |
Machinery Test Report | Provided |
Video Outgoing-Inspection | Provided |
Power (W) | 180 |
MOQ | 1 Set |
Net Weight | 22 kg |
Condition | New |
Showroom Location | None |
Max. Turned Length (mm) | 180 |
Spindle Bore (mm) | 9 |
Year | 2021 |
Core Components | Bearing, Pump, Gear, Motor, Gearbox, PLC, Pressure Vessel, Engine, Other |
Applicable Industries | Hotels, Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction Works, Energy & Mining, Food & Beverage Shops, Advertising Company, Other |
After-Sales Service Provided | Online Support |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.