$6,705.00
The machine delivers high-accuracy machining capabilities, ideal for industries such as manufacturing plants, food and beverage factories, and construction works. Its light-duty machining capacity ensures efficient and precise work in diverse settings, including garment shops, building material shops, and machinery repair shops.
With compatibility across multiple industries—such as hotels, food shops, printing shops, and retail stores—this machine is a versatile asset for workshops or factories. Backed by a 1.5-year warranty and video technical support, customers are assured reliable assistance and maintenance for uninterrupted operations.
Certified with CE and ISO standards, the machine offers advanced features, including 3-axis milling capability and a spindle speed range of 100-2250 r.p.m. These features make it a reliable and efficient tool for a wide range of machining tasks.
Attribute | Details |
---|---|
Table Travel (X) (mm) | 440 |
Table Travel (Y) (mm) | 200 |
Table Travel (Z) (mm) | 400 |
Machining Capacity | Light Duty |
Spindle Taper | MT3 |
Range of Spindle Speed (r.p.m) | 100 – 2250 r.p.m |
Type | Horizontal |
Spindle Motor Power (kW) | 1.5 |
Voltage | 220V/380V |
Weight (kg) | 220 |
Warranty | 1.5 Years |
Place of Origin | Anhui, China |
Brand Name | Amrocor |
Model Number | CTV36 |
Dimensions (LWH) | 10007001000 mm |
Key Selling Points | High-accuracy |
Machinery Test Report | Provided |
Video Outgoing-Inspection | Provided |
Power (W) | 1500 |
After-Sales Service Provided | Online Support |
After-Warranty Service | Video Technical Support |
Certification | CE ISO |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.