$4,567.00
The High-Accuracy Milling Machine is built to deliver precision machining, making it ideal for a wide range of applications across industries like hotels, garment shops, and manufacturing plants. Its multi-functional design, featuring a multi-spindle drill head, enables simultaneous drilling and milling, significantly boosting productivity and efficiency for businesses such as building material shops and food & beverage factories.
This machine is highly versatile, serving industries including construction works, energy & mining, and food shops. Its robust design incorporates high-quality components like bearings, motors, and gearboxes, ensuring reliable, long-term performance with minimal downtime.
Customers benefit from comprehensive after-sales support, including video technical assistance, machinery test reports, and warranty coverage for core components. These features provide peace of mind and ensure the smooth operation and maintenance of this durable and efficient machine.
Key Attributes
Attribute | Details |
---|---|
Industry-Specific Attributes | |
Table travel (X) (mm) | 220 |
Table travel (Y) (mm) | 160 |
Table travel (Z) (mm) | 200 |
Other Attributes | |
Machining capacity | Light Duty |
Spindle taper | MT2 |
Range of spindle speed (r.p.m) | 100 – 2250 |
Type | Horizontal |
Spindle motor power (kW) | 0.75 |
Voltage | 220V |
Weight (kg) | 60 |
Warranty | 1.5 years |
Place of origin | ANH |
Brand Name | Amrocor |
Model number | CTV21 |
Dimension (LWH) (mm) | 510490750 |
Key selling points | High-accuracy |
Machinery test report | Provided |
Video outgoing-inspection | Provided |
Voltage | 220V |
Wattage | 750W |
MOQ | 1 set |
Size | 510490750 mm |
Net weight | 60 kg |
Power (W) | 750 |
After-sales service provided | Video technical support |
Certification | CE, ISO |
We process all orders within 24 hours of confirmation. Production times vary depending on the product and specific order requirements. To receive the most accurate lead time, please email us before placing your order so we can provide detailed information.
As a general guideline, estimated production times are as follows:
Oil: 6-8 weeks
Generators: 16-20 weeks
Transformers: 8-12 weeks
Switchgears: 8-12 weeks
Industrial Equipment: 8-12 weeks
Wiring & Cables: 2-4 weeks
While we strive to meet the estimated timelines, unforeseen factors may affect production and delivery schedules. We will make every effort to keep you updated throughout the process to ensure a smooth experience.
By placing an order, you agree to our terms and conditions, including any applicable production and shipping policies.
©2025. Amrocor All Rights Reserved.